🏙 City Solar Guides
Rooftop Solar in Chandigarh 2026: Cost, Subsidy, PSPCL Process and What to Expect

Peak sun hours5.0 hrs/day
3kW monthly gen278-305 units
Max subsidyRs 78,000
Payback period2-3 years
DISCOMPSPCL
Solar in Chandigarh: the key numbers
Chandigarh receives an average of 5.0 peak sun hours per day, making it a strong location for rooftop solar. A 3 kW system here generates approximately 278-305 units per month, enough to offset 60 to 90 percent of typical household consumption in a 2-3 BHK home.
The DISCOM serving Chandigarh is Punjab State Power Corporation Limited (PSPCL). Solar applications go through the PM Surya Ghar portal at pmsuryaghar.gov.in and are processed by the PSPCL consumer section. Chandigarh falls under PSPCL jurisdiction. The city has well-organised DISCOM processes and relatively faster inspection scheduling compared to UP cities.
1 kW
Studio or 1BHK · 90-120 units/month
Subsidy: Rs 30,000
2 kW
2 BHK · 180-240 units/month
Subsidy: Rs 60,000
3 kW+
3 BHK · 270-360 units/month
Subsidy: Rs 78,000MAX
Installation cost and savings in Chandigarh: April 2026
| System Size | Installed Cost | PM Surya Ghar Subsidy | Net Cost | Monthly Saving | Payback |
|---|---|---|---|---|---|
| 1 kW | Rs 45,000-60,000 | Rs 30,000 | Rs 15,000-30,000 | Rs 600-900 | 2-4 years |
| 2 kW | Rs 85,000-1,10,000 | Rs 60,000 | Rs 25,000-50,000 | Rs 1,200-1,800 | 2-4 years |
| 3 kW | Rs 1,20,000-1,50,000 | Rs 78,000 | Rs 42,000-72,000 | Rs 1,800-2,500 | 2-3 years |
| 5 kW | Rs 1,90,000-2,40,000 | Rs 78,000 | Rs 1,12,000-1,62,000 | Rs 3,000-4,200 | 3-5 years |
PSPCL PM Surya Ghar process: what is different here
1
Register at pmsuryaghar.gov.inSelect Punjab/Chandigarh as your state and PSPCL as your DISCOM. Enter your consumer number exactly as on your electricity bill.
2
DISCOM feasibility checkPSPCL typically takes 7 to 21 working days for feasibility approval. Urban circles in Chandigarh can be faster during low-volume periods.
3
Select empanelled installer from portalFilter the portal vendor list by Punjab/Chandigarh and PSPCL to see installers approved for Chandigarh. Verify empanelment before any conversation about pricing.
4
Installation, inspection and net meterAfter DISCOM approval, installation typically takes 1 to 3 days. Net metering application must be filed within 30 days. PSPCL inspection scheduling takes 14-21 working days in Chandigarh.
5
Subsidy credit to bank accountAfter commissioning certificate, submit bank details on the portal. Subsidy arrives within 30 to 90 working days depending on Punjab/Chandigarh processing speed.
Key checks before installing in Chandigarh
☀️
South-facing roofCheck your roof faces south or south-west for maximum generation in Chandigarh’s climate.
📋
Verify installer empanelmentCheck on portal before engaging. Only PSPCL-empanelled installers qualify for PM Surya Ghar subsidy.
✅
Sanctioned load checkEnsure your sanctioned load is equal to or greater than planned solar system size.
📄
Electricity bill consumer categoryMust be residential category for PM Surya Ghar subsidy eligibility in Punjab/Chandigarh.
🚫
Avoid installation in monsoon peakJuly to September installation is possible but DISCOM inspection scheduling can be slower.
🚫
Do not pay full amount upfrontPay 40-50% upfront, balance after DISCOM commissioning certificate is received.
Frequently asked questions
Is solar worth it in Chandigarh compared to other cities?
Chandigarh receives 5.0 peak sun hours per day which gives strong solar returns. Combined with the PM Surya Ghar subsidy of up to Rs 78,000, the net cost after subsidy for a 3 kW system is Rs 42,000 to Rs 72,000 with a payback period of 2-3 years. This makes solar a good investment in Chandigarh for any home consuming over 150 units per month.
Which solar installer should I choose in Chandigarh?
Use the PM Surya Ghar portal vendor list filtered by Punjab/Chandigarh and PSPCL to find empanelled installers in your area. Get at least 3 quotes, verify all quotes include ALMM-listed panels and DISCOM liaison, and compare on a cost-per-kW basis after confirming all inclusions are equal.
How long does the full process take in Chandigarh?
From portal registration to subsidy credit, the typical timeline in Chandigarh is 3 to 6 months. This includes DISCOM feasibility check (2 to 3 weeks), installation (1 to 3 days), inspection and net meter (4 to 8 weeks), and subsidy disbursement after commissioning (4 to 12 weeks). Faster if your documentation is complete and your installer is active in following up.
Can I install solar if I live in a rented house in Chandigarh?
No. PM Surya Ghar subsidy requires you to own the property or have a long-term lease agreement. Tenants cannot apply. If you are renting, your landlord can apply if the electricity connection is in their name. The subsidy would go to the property owner.
Apni solar savings calculate karo
Free. Koi signup nahi. Real numbers.
Calculator kholo →