Rooftop Solar in Agra 2026: Cost, Subsidy, DVVNL Process and What to Expect

👤 SolarSahi Team
📍 Agra, Uttar Pradesh
📅 April 2026
🔄 Regular updates
✓ DISCOM verified · April 2026

Rooftop Solar in Agra 2026: Cost, Subsidy, DVVNL Process and What to Expect
☀️Peak sun hours5.4 hrs/day
3kW monthly gen298-325 units
💰Max subsidyRs 78,000
⏱️Payback period2-3 years
🏛DISCOMDVVNL

Solar in Agra: the key numbers

Agra receives an average of 5.4 peak sun hours per day, making it a strong location for rooftop solar. A 3 kW system here generates approximately 298-325 units per month, enough to offset 60 to 90 percent of typical household consumption in a 2-3 BHK home.

The DISCOM serving Agra is Dakshinanchal Vidyut Vitran Nigam Limited (DVVNL). Solar applications go through the PM Surya Ghar portal at pmsuryaghar.gov.in and are processed by the DVVNL consumer section. Agra is one of the sunniest cities in North India. High dust levels from Yamuna floodplains mean more frequent cleaning is needed than other UP cities.

1 kW
Studio or 1BHK · 90-120 units/month
Subsidy: Rs 30,000
2 kW
2 BHK · 180-240 units/month
Subsidy: Rs 60,000
3 kW+
3 BHK · 270-360 units/month
Subsidy: Rs 78,000MAX

Installation cost and savings in Agra: April 2026

System Size Installed Cost PM Surya Ghar Subsidy Net Cost Monthly Saving Payback
1 kW Rs 45,000-60,000 Rs 30,000 Rs 15,000-30,000 Rs 600-900 2-4 years
2 kW Rs 85,000-1,10,000 Rs 60,000 Rs 25,000-50,000 Rs 1,200-1,800 2-4 years
3 kW Rs 1,20,000-1,50,000 Rs 78,000 Rs 42,000-72,000 Rs 1,800-2,500 2-3 years
5 kW Rs 1,90,000-2,40,000 Rs 78,000 Rs 1,12,000-1,62,000 Rs 3,000-4,200 3-5 years

DVVNL PM Surya Ghar process: what is different here

1
Register at pmsuryaghar.gov.inSelect Uttar Pradesh as your state and DVVNL as your DISCOM. Enter your consumer number exactly as on your electricity bill.
2
DISCOM feasibility checkDVVNL typically takes 7 to 21 working days for feasibility approval. Urban circles in Agra can be faster during low-volume periods.
3
Select empanelled installer from portalFilter the portal vendor list by Uttar Pradesh and DVVNL to see installers approved for Agra. Verify empanelment before any conversation about pricing.
4
Installation, inspection and net meterAfter DISCOM approval, installation typically takes 1 to 3 days. Net metering application must be filed within 30 days. DVVNL inspection scheduling takes 21-35 working days in Agra.
5
Subsidy credit to bank accountAfter commissioning certificate, submit bank details on the portal. Subsidy arrives within 30 to 90 working days depending on Uttar Pradesh processing speed.

Key checks before installing in Agra

☀️

South-facing roofCheck your roof faces south or south-west for maximum generation in Agra’s climate.
📋

Verify installer empanelmentCheck on portal before engaging. Only DVVNL-empanelled installers qualify for PM Surya Ghar subsidy.

Sanctioned load checkEnsure your sanctioned load is equal to or greater than planned solar system size.
📄

Electricity bill consumer categoryMust be residential category for PM Surya Ghar subsidy eligibility in Uttar Pradesh.
🚫

Avoid installation in monsoon peakJuly to September installation is possible but DISCOM inspection scheduling can be slower.
🚫

Do not pay full amount upfrontPay 40-50% upfront, balance after DISCOM commissioning certificate is received.

Frequently asked questions

Is solar worth it in Agra compared to other cities?
Agra receives 5.4 peak sun hours per day which gives strong solar returns. Combined with the PM Surya Ghar subsidy of up to Rs 78,000, the net cost after subsidy for a 3 kW system is Rs 42,000 to Rs 72,000 with a payback period of 2-3 years. This makes solar a good investment in Agra for any home consuming over 150 units per month.

Which solar installer should I choose in Agra?
Use the PM Surya Ghar portal vendor list filtered by Uttar Pradesh and DVVNL to find empanelled installers in your area. Get at least 3 quotes, verify all quotes include ALMM-listed panels and DISCOM liaison, and compare on a cost-per-kW basis after confirming all inclusions are equal.

How long does the full process take in Agra?
From portal registration to subsidy credit, the typical timeline in Agra is 3 to 6 months. This includes DISCOM feasibility check (2 to 3 weeks), installation (1 to 3 days), inspection and net meter (4 to 8 weeks), and subsidy disbursement after commissioning (4 to 12 weeks). Faster if your documentation is complete and your installer is active in following up.

Can I install solar if I live in a rented house in Agra?
No. PM Surya Ghar subsidy requires you to own the property or have a long-term lease agreement. Tenants cannot apply. If you are renting, your landlord can apply if the electricity connection is in their name. The subsidy would go to the property owner.